摘要
文章就燃灯寺水库大坝工程大坝坝身和坝基存在渗漏问题和大坝防渗范围进行了深入分析,通过大坝坝身和坝基防渗方案比较、防渗方案技术经济比较,就大坝防渗方案而言,认为黏土井柱防渗墙设计为最优防渗处理方案。
The paper analyzed the seepage problems and seepage control range which existed in dam body and dam foundation.By comparing the anti-seepage schemes and economies of the dam body and dam foundation,clay well column anti-seepage wall design is the optimum anti-seepage processing scheme.
关键词
高喷防渗墙加黏土井柱
坝身
坝基
方案
high jet cutoff wall and clay well column
dam body
foundation
scheme