摘要
对制定矮塔斜拉桥的荷载试验方案进行了分析,以大广高速公路黄龙带特大桥为依托,建立有限元模型,分析矮塔斜拉桥的结构受力特性,确定荷载工况与试验截面,计算试验荷载大小与位置,对加载工况进行合并,依据理论计算制定合理的静动载试验方案。可为同类型的桥梁荷载试验提供参考。
The load test scheme for a short tower cable-stayed bridge has been analyzed in this article. Being based on Huanglongdai Special Large Bridge of Daguang Express, a finite element model has been set up, the structure stressing features of the short tower cable-stayed bridge have been analyzed, the load case and test sec-tion have been determined, the load size and location have been calculated, the load case has been merged, rea-sonable static and dynamic load test schemes have been worked out on the basis of the theoretical calculation, which could provide references for the similar bridge load tests.
出处
《广东公路交通》
2016年第4期57-60,69,共5页
Guangdong Highway Communications
关键词
矮塔斜拉桥
荷载试验方案
静载试验
动载试验
short tower cable-stayed bridge
load test scheme
static load test
dynamic load test