大跨度连续梁桥进行施工时,必须提出合理的施工方案并对整个施工阶段进行有效的监控管理。施工期间发现任何问题立即对其进行调整,并制定出可行方案保证工程质量,尽可能将施工期间存在的风险降到最低。
During the construction of large-span continuous bridge, reasonable construction plan should be worked out, and effective monitoring and management should be carried out throughout the entire construction phase. During the construction, immediate treatment measures would be taken when problems being found, with feasible solutions being worked out to ensure project quality, which could as far as possible reduce the risks dur-ing construction to the minimum.
出处
《广东公路交通》
2016年第4期70-72,共3页
Guangdong Highway Communications
关键词
大跨度
连续梁桥
施工控制
large-span
continuous girder bridge
construction control