大石岭隧道右洞初支变形侵限换拱处理施工 被引量:5

Treatment Construction of Arch Replacement for Right Initial Support Limit Deformation of Dashiling tunnel
下载PDF
导出
摘要 江(门)罗(定)高速公路大石岭隧道因围岩破碎,施工期间正值雨季,连月大雨,使雨水往下渗,岩体遇水膨胀软化,导致隧道初支严重变形,侵入二衬界限内。为保证隧道的施工质量和安全,采用回填土反压初期支护,中管棚、小导管注水泥浆固结围岩,然后替换原有初期支护。 As for Dashiling Tunnel of Jiang (men ) - Luo (ding) Expressway, severe deformation of and intruding into the lining scope of the initial support occurred due to its weak and broken surrounding rock, which became swelling and softening with water seeping through from months of heavy rain during the construction. In order to ensure the construction quality and safety of the tunnel, backfilling to support the initial support and strengthening the surrounding rock with middle pipe shed and small pipe grouting have been carried out, then the original initial support has been replaced.
作者 柳果红 文艺
出处 《广东公路交通》 2016年第4期97-100,共4页 Guangdong Highway Communications
关键词 隧道工程 变形侵限 注浆加固 换拱 tunnel engineering limit deformation brouting reinforcement replacing arch
  • 相关文献

参考文献2

二级参考文献8

  • 1铁道部工程设计鉴定中心编制,《高速铁路隧道》,中国铁道出版社.
  • 2《铁路隧道工程施工安全技术规程》(TBl0304-2009)中铁二局集团有限公司,中国铁道出版社.
  • 3《高速铁路隧道工程施工质量验收标准》(TBl0753-2010),中铁一局集团有限公司,中国铁道出版社.
  • 4《高速铁路隧道工程施工技术指南》(铁建设[2010]41号),中铁二局集团有限公司.中国铁道出版社.
  • 5《铁路隧道监控量测技术规程》(TB10121-2007),中铁二院工程集团有限责任公司,中国铁道出版社.
  • 6TB 10204-2002.铁路隧道施工规范[S]..2002
  • 7彭小兵.隧道变形侵限换拱施工技术[J].中华建设,2011(8):202-203. 被引量:3
  • 8夏勇.浅谈隧道围岩加固及换拱施工技术[J].河北交通职业技术学院学报,2010,7(2):30-34. 被引量:2

共引文献1

同被引文献25

引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部