摘要 气基流体钻井在提高机械钻速、防漏止漏、发现及保护油气藏等方面的应用越来越广。实践表明,性能优良、应用可靠、配套科学的设备、装置及工具是气基流体钻井顺利实施的基础。对该项技术所需的钻井动力设备及装置、井口控制设备及装置、相关入井工具的性能、原理、特点及现场应用要求进行了探讨及介绍。对空气钻井、氮气钻井、雾化钻井、泡沫钻井及充气钻井液钻井现场所需的设备、装置及仪器的摆放安置、规划布局、配套要求等分别进行了阐述及分析。最后,对气基流体钻井装备配套的发展提出了认识及建议。 Gas-based fuid drilling is used more and more widely in enhancing ROP, preventing and eliminating lost circulation, and fnding and protecting hydrocarbon reservoirs. On-site applications show facilities, equipment and tools of good performances, in high reliability and rational combinations are necessary for smooth implementation of gas-based fuid drilling. In this paper, performance, principles, specifc features and on-site application requirements of necessary power equipment, wellhead controller, relevant bottom-hole assemblies and auxiliary facilities required by the drilling operation are discussed and presented. In addition, position, planning, confguration and matching requirements on equipment and facilities needed for air drilling, nitrogen drilling, mist drilling, foam drilling and aerated drilling operations have been elucidated. Finally, understandings and recommendations on necessary facilities of gas-based fuid drilling have been put forward.
出处 《石油钻采工艺》 CAS CSCD 北大核心 2016年第4期432-437,共6页 Oil Drilling & Production Technology
基金 中国石油天然气股份有限公司重大科技专项"新疆和吐哈油田油气持续上产勘探开发关键技术研究"的子课题"复杂油气藏优快钻井技术研究"(编号:2012E-34-13)
关键词 气基流体钻井 装备配套 动力设备 井口控制设备 入井工具 drilling with gas-based fuid matching facility power equipment wellhead controller bottom-hole assembly
  • 相关文献

参考文献5

二级参考文献36

  • 1杨肖曦,李松岩,林日亿,孙茂盛,张立.泡沫流体携砂能力的数值模拟[J].中国石油大学学报(自然科学版),2006,30(3):89-92. 被引量:21
  • 2Guo Boyun,Ghalambor A.欠平衡钻井气体体积流量的计算[M].胥思平,译.北京:中国石化出版社,2006:9-28.
  • 3纪兵兵,陈金瓶.ANSYSICEMCFD网格划分技术实例详解[M].北京:中国水利水电出版社.2012,206-243.
  • 4王树江,曹强,陈彦彪.氮气钻井技术在普光202-1井的应用[J].石油钻采工艺,2007,29(5):23-25. 被引量:10
  • 5张端琴. 泡沫液性能及岩屑对泡沫钻井稳定性影响的研究[D]. 长春:吉林大学,2007.
  • 6OKPOBIRI G A,IKOKU C U. Volumetric requirementsfor foamand mist drilling operations[R]. SPE 11723, 1986.
  • 7KRUG J A, MITCHELL B J. Charts help find volume,pressure needed for foam drilling[J]. Oil and Gas,1982(2): 61-64.
  • 8VOGEL R. Continuous circulation system debuts withcommercial successes offshore Egypt, Norway [J].Drilling Contractor, 2006, 62(6):50-52.
  • 9ANGELO Calderoni, GIORGIO Girola, HELIO Sanlos,et al. Microflux control and E-CD continuous circulationvalves allow operator to reach HPHT reservoirs for thefirst time[R]. SPE 122270, 2009.
  • 10ADEWUMI M A, TIAN Shifeng, WATSON R W. Fundamentalstudy makes improved air drilling technologypossible[R]. SPE 26893, 1993.

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部