既有隧道衬砌结构在引水洞爆破施工中的安全性分析 被引量:6

Safety Analysis of an Existing Tunnel Lining Structure during Water Diversion Tunnel Blasting Construction
下载PDF
导出
摘要 在溶洞核心区域段,隧道受水压的影响易发生衬砌渗漏水现象。为了解决衬砌渗漏水问题,通过在正洞顶部施作引水洞,截取岩溶水,可以减小作用在隧道衬砌周围的水压力。文章结合西部某铁路隧道引水洞施工实例,通过监测引水洞爆破开挖振动速度、正洞衬砌结构受力和变形,分析得出爆破振动速度和结构受力均控制在允许标准范围内,并且隧道衬砌结构基本没有变形,结构受力相对稳定。监测数据表明,引水洞施工对正洞衬砌结构影响小,确保了隧道结构的稳定,保证了运营铁路线的安全。 Beeause it is affected by water pressure, lining leakage tends to oeeur in the eore region of a karsl taws. In order to solve this problem, a water diversion tunnel was constructed at the top uf a main tunnel to drain karst water in order to reduce the water pressure around tile lunnel lining. Based on construction of a water diversion tunnel for a railway tunnel in western China, this paper shows that lhe blasting vibration velocity and the structural stress were aceeplable and the tunnel structure had basically no deformation and a relatively stable structural stress based on the monitoring of the water diversion tunnel blasling vibralinn velueity, struetural stress and deformatiou of the main tunnel lining. The monitoring data indicate that eonstruetion of the water diversion tunnel had little influence on the main runnel lining structure, which ensured the stability of the tunnel structure and operation safety of the railway.
作者 张文新
出处 《现代隧道技术》 EI CSCD 北大核心 2016年第4期154-158,共5页 Modern Tunnelling Technology
关键词 既有铁路隧道 引水洞 爆破施工 隧道衬砌 安全性分析 Fxisting railway tunnel Water diversion tunnel Blasting construction Tunnel lining Safety analysis
  • 相关文献

参考文献4

二级参考文献27

共引文献30

同被引文献35

引证文献6

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部