长沙地铁4号线明挖车站防水新技术探讨 被引量:4

Discussion on New Waterproofing Technology of Open-cut Station of Changsha Rail Transit, Line 4
下载PDF
导出
摘要 长沙地铁4号线一期工程汉王陵公园站,底板和侧墙部位选用HDPE防水卷材+喷涂速凝橡胶沥青防水涂料的涂卷复合防水方案,顶板部位直接施工喷涂速凝橡胶沥青防水涂料。分别介绍了两种方案的施工工艺及重点控制事项,并论述了预铺反粘新工艺在地下工程防水中的优势。 The Han Tomb Park Station for the first phase project of Changsha Rail Transit Line 4 adopted HDPE waterproofing membrane and spraying-applied & fast-cured rubber-modified bitumen waterproofing coating for basement and side walls, and merely spraying-applied & fast-cured rubber-modified bitumen waterproofing coating for roof part. This article elaborates the construction process and attention points for the two schemes, and discusses the advantages for the new pre-laid method in underground waterproofing engineering.
出处 《中国建筑防水》 2016年第17期10-13,共4页 China Building Waterproofing
关键词 明挖车站 地下防水 预铺反粘新工艺 细部节点 施工缝 变形缝 open-cut station underground waterproofing new pre-laid technology details construction joint deformation joint
  • 相关文献

参考文献2

二级参考文献2

  • 1全国轻质与装饰装修建筑材料标准化技术委员会.GB/T23457-2009预铺/湿铺防水卷材[S].北京:中国标准出版社.2009.
  • 2总参工程兵科研三所.GB50108-2008地下工程防水技术规范[S].北京:中国计划出版社,2008.

共引文献18

同被引文献10

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部