摘要
本文详细叙述了阳澄湖枢纽工程中地涵深基坑的降排水设计方法、运作原理、施工工序及需要注意的各事项,为地涵主体洞首、洞身的施工创造干地施工条件。
In the paper, drainage design method, operation principle, construction process and all precautions of underground culvert deep foundation pit in Yangcheng Lake key project are described in detail. D17 land construction conditions are created for constructing culvert head and barrel of underground culvert main body.
出处
《水利建设与管理》
2016年第6期6-9,5,共5页
Water Conservancy Construction and Management
关键词
地涵
施工降水
管井
水泵
underground culvert
construction drainage
tube well
water pump