期刊文献+

阳茂高速特大桥连续梁施工技术研究 被引量:3

Research on Construction Technology of Continuous Beam of Yang-Mao Expressway Bridge
下载PDF
导出
摘要 随着我国高速铁路建设的飞速发展,高速铁路大跨度桥梁的施工技术受到更为广泛的关注。本文结合新建深圳至茂名铁路高速特大桥工程实例,阐述了阳茂高速铁路特大桥挂篮悬臂浇筑施工过程的施工工艺操作要点及方法,并着重对江门至茂名段(76+160+76)m连续梁挂篮悬臂浇筑工法、及合拢段技术进行了论述与研究。 With the rapid development of China's high-speed railway construction, high-speed railway long-span bridge construction technology has been more extensive attention. Taking a new high-speed railway from Shenzhen to Mao-ming Bridge project as an example,this paper expounds the construction technology operation points and methods of the cantilever casting construction process of Yang-Mao High Speed Railway Bridge, focuses on the discuss and analysis of hanging basket cantilever casting method and linear control technology of Jiang-men to Mao-ming section(76 +160 +76) m continuous beam and provides information and reference for the similar bridge construction.
作者 王新刚
出处 《价值工程》 2016年第27期105-106,共2页 Value Engineering
关键词 连续梁 挂篮悬臂 高速铁路 continuous beam cantilever hanging basket high-speed railway
  • 相关文献

参考文献5

二级参考文献13

  • 1邓立东.连续梁桥施工控制方法研究[J].中国水运(下半月),2010,10(1):160-161. 被引量:4
  • 2陈舟顺.连续梁悬臂浇筑施工线型控制[J].安徽建筑,2006,13(1):86-87. 被引量:5
  • 3姚铃森.桥梁工程[M].北京:人民交通出版社,1998.
  • 4铁道部.客运专线铁路桥涵工程施工质量验收暂行标准[S].
  • 5GB50026-2007,工程测量规范[M].北京:中国计划出版社,2008.
  • 6GB/T50081-2002.普通混凝土力学性能试验方法标准[S].[S].,..
  • 7TB10101-20094961-2009,铁路工程测量规范[M].北京:中国铁道出版社.
  • 8TZ203-2008,客货共线铁路桥涵工程施工技术指南[M].北京:中国铁道出版社,2008.
  • 9TB10415-2003,J286-2004,铁路桥涵工程施工质量验收标准[M].北京:中国铁道出版社,2010.
  • 10TZ324-2010,铁路预应力混凝土连续梁(钢构)悬臂浇筑施工技术指南[M].北京:中国铁道出版社,2010.

共引文献56

同被引文献20

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部