摘要 在模块化建设的设计理念下,AP1000和CAP1400核电站出现了多件超过千吨的超级模块,为大型运输工作提出了极大挑战。因此提高核电工程大型设备运输水平极为重要。不同的大型设备运输在变形允许度、加速度要求、充氮要求等方面各有要求,本文仅针对AP/CAP系列核电工程大型设备陆路运输做简要探讨。 According to modular construction design concepts, plural pieces of super module more than 1000 tons appeared in API000 and CAP1400 nuclear power plants, which has brought a great challenge for large scale transporta-tion work, so the improvement of transportation capacity for large scale equipments in nuclear power engineering is very important. Different large scale equipments transportation has their own requirements on deformation allowance, accel-eration ,nitrogen charging and so on. The land transportation for large scale equipments in AP/CAP series of nuclear power engineering has been discussed in the paper.
作者 孙远明 程勇
出处 《中国重型装备》 2016年第3期40-41,共2页 CHINA HEAVY EQUIPMENT
关键词 核电工程大型运输装载 装载稳性 道路承载能力 large scale transport loading in nuclear power engineering load stability road carrying capacity
  • 相关文献

参考文献1

共引文献3

同被引文献15

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部