摘要
以南京地铁两座区间洞口雨水泵站设计为例,分析了汇水面积、地面集流时间对雨水泵站设计流量的影响;指出线路坡度可直接影响雨水的地面集流时间,进而影响设计暴雨强度的计算,即在相同重现期、相同暴雨强度公式的情况下,设计暴雨强度的计算结果也可能不一样;雨水排水泵站的设计规模应根据实际情况计算确定,以确保暴雨工况下安全运行。
Takingthedesignoftworainwaterpumpingstationsattheportalofareasin Nanjing Metroasanexample,the article analyzes the influence of catchment area and ground collecting time on the design flow of rainwater pumping station, and points out the line gradient can directly influence the ground collecting time of rainwater so as to influence the calculation of design rainstorm intensity. Even under the condition of same return period and same rainstorm intensity formula, the calculation result of design rainstorm intensity also may be different. The design scaleofrainwaterdrainagepumpingstationshouldbebasedonthepracticalconditiontocalculateanddeterminein ordertoensurethesafeoperationduringrainstorm.
出处
《城市道桥与防洪》
2016年第9期164-165,180,共3页
Urban Roads Bridges & Flood Control
关键词
地铁
洞口泵站
设计流量
集流时间
降雨历时
metro
pumpingstation atportal
design flow
collectingtime
rainfallduration