摘要
盾构区间联络通道融沉注浆施工对盾构管片隆沉有明显影响,就融沉注浆施工导致的三种注浆效果导致的管片隆沉监测进行阐述和数据分析,可为联络通道融沉注浆信息化施工提供参考。
The thaw settlement grouting construction of shield section connecting passageway has the obvious influence on the settlement of shield segment. The article sets forth the monitor of thaw settlement grouting construction leading to three grouting effects of segment settlement and analyzes the data, which can be referred for the thaw settlement grouting informatization construction of connecting passageway.
出处
《城市道桥与防洪》
2016年第9期192-194,19,共3页
Urban Roads Bridges & Flood Control
关键词
联络通道
融沉注浆
管片沉降
盾构隧道
connecting passageway
thaw settlement grouting
segment settlement
shield tunnel