期刊文献+

坪底供水工程供水规模调整设计

The design of water supply scale adjustment of Pingdi water supply project
下载PDF
导出
摘要 随着石楼县经济发展供水任务增加,坪底供水工程原设计供水规模难以满足工业和生活用水需求,因此,需对该供水工程规模进行调整。经计算,该工程年供水量650万m^3,供水保证率95%,供水流量0.3m^3/s;工程总库容744万m^3,调蓄池容积120万m^3。 With the increase of economic development and water supply needs of Shilou county, The original design scale of water supply of Pingdi water supply project is difficult to meet the needs of industrial and domestic water. So It is need to adjust the scale of this water supply, reckoned, The project annual water supply is 6 million 500 thousand m3,Its water supply guarantee rate is 95% ,The Water supply flow is 0.3m3/s ;The total capacity is 7 million 440 thousand m3,The storage tank volume is 1 million 200 thousand m3.
作者 张敏
出处 《水科学与工程技术》 2016年第4期22-25,共4页 Water Sciences and Engineering Technology
关键词 供水规模 调整 供水保证率 Scale of water supply adjust water supply guarantee rate
  • 相关文献

参考文献2

  • 1山西省水利水电勘测设计研究院.山西省石楼县坪底供水工程可行性研究补充报告,2013.
  • 2SL278-2002.水利水电工程水文计算规范[S].[S].,..

共引文献61

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部