摘要
介绍新钢焦化厂6号装煤车三电系统的升级优化思路和实施方案,描述走行变频器优化及控制原理。
EIC system upgrade and optimization strategy and implementation plan are introduced for No. 6 charging car of the coking plant in Xinyu Iron and Steel Co. Walking converter optimization and control principle are described.
出处
《江西冶金》
2016年第4期30-33,共4页
Jiangxi Metallurgy
关键词
装煤车
走行变频器
螺旋给煤
优化
coal charging car
walking inverter
screw coal feed
optimization