印尼帕卡特水电站竖井压力钢管安装方案浅析 被引量:2

On shaft pressure steel pipe installation plan in Indonesia Packard Hydropower Station
下载PDF
导出
摘要 印尼帕卡特水电站竖井压力钢管,竖井约130m,该工程在洞内施工,受场地、设备和施工道路的限制,施工条件复杂,任务重,工期紧,难度大,不安全因素多。本文根据笔者多年的现场施工经验对其安装方案进行分析。 The shaft is about 130 m aiming at shaft pressure steel pipe in Indonesia Packard Hydropower Station. The project is constructed in the tunnel,which is limited by site,equipment and construction roads. It is characterized by complicated construction conditions,heavy construction task,tight construction period,high construction difficulty and many unsafe factors. In the paper,the installation plan is analyzed according to site construction experience of the author for many years.
作者 张国功
出处 《中国水能及电气化》 2016年第8期11-14,共4页 China Water Power & Electrification
关键词 竖井 压力钢管 安装 方案 浅析 帕卡特水电站 shaft pressure steel pipe installation plan analysis Packard Hydropower Station
  • 相关文献

参考文献4

二级参考文献3

共引文献5

同被引文献4

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部