摘要
克孜尔水库主副坝之间存在F_2断层,且断层仍在活动,本文根据实测资料对F_2断层除险加固防渗效果作了评价,认为防渗达到了一定效果,后期仍需加强监测。
There is F2 fault between main dam and auxiliary dam in Kizil Reservoir. The fault is still active. In the paper,risk removal reinforcement effect of F2 fault is evaluated according to measured data. It is believed that the seepage control reaches certain effect,and monitoring still should be strengthened consequently.
出处
《中国水能及电气化》
2016年第8期21-24,共4页
China Water Power & Electrification
关键词
克孜尔水库
F2断层
防渗
Kizil Reservoir
F2 fault
seepage control