期刊文献+

马坑铁矿井下排水方案优化设计 被引量:1

Optimization design for underground drainage scheme of Makeng Iron Ore Mine
下载PDF
导出
摘要 马坑铁矿属于涌水量大、水文地质条件复杂、有突然涌水可能的地下矿山。结合工程改扩建情况,在现有排水系统条件下,对井下排水系统方案选择、设备选型及相关配套设施、工程和运行费用等方面进行了详细论证,得出了适合于马坑铁矿的最优排水方案,提升了矿山的装备水平和矿山生产的安全性。 The Makeng iron ore mine is the mine with huge water discharge,complex hydrogeological condition and the possibility of water outburst. In combination with the practical situation of Makeng iron mine project reconstruction and expansion,detailed argumentation was given in terms of the selection of drainage system scheme,equipment selection,auxiliary facilities,engineering and operation cost etc. under the existing drainage system condition,the optimal drainage scheme suitable for Makeng iron ore mine was obtained,and the equipment level of the mine and the mine production safety were promoted.
作者 马丽平
出处 《工程建设》 2016年第4期60-65,78,共7页 Engineering Construction
关键词 排水系统 涌水量 水泵 水泵房 drainage system water discharge water pump pump house
  • 相关文献

参考文献2

  • 1中华人民共和国国家质量监督检验检疫总局,中国国家标准化管理委员会.金属非金属矿山安全规程(GB16423-2006)[S].北京,2006.
  • 2郑锡恩,刘洞理,王世华,等.采矿设计手册(4)-矿山机械卷[M].北京:中国建筑工业出版社,1988.

共引文献42

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部