期刊文献+

通过信息化建设促进工程造价全过程管理

Promotion of engineering cost whole-process management through information-based construction
下载PDF
导出
摘要 工程造价全过程管理面临各阶段造价数据相对割裂、多部门信息沟通不畅等问题,在大体量复杂工程中表现尤为突出。咨询机构可以通过信息化建设,运用咨询企业管理系统等工具,来解决上述问题。为满足大体量复杂工程造价全过程管理使用,咨询企业信息化系统应集成办公自动、项目投资控制系统和企业数据库等功能。本文以实际项目为例,介绍了咨询企业信息化系统的建设方式和运用方法。信息化建设满足了工程造价全过程管理的需求。 Whole process management of engineering cost has problems of relative splitting of cost data at all stages, unsmooth multi-department information communication, etc. The problems are prominent particularly in the huge-scale complex project. Con- sultants can solve the above problems through information-based construction by using consulting enterprise management system and other tools. Information-based system of consulting enterprises should integrate functions of office automation, project investment control system, enterprise database, etc. in order to meet cost whole-process management and use of huge-scale complex engineering cost. In the paper, actual projects are regarded as an example for introducing construction mode and application method of information-based system of consulting enterprises. Information-based construction can meet the demand of whole-process management of engineering cost.
作者 杨连仓
出处 《工程造价管理》 2016年第4期53-54,共2页 Engineering Cost Management
关键词 工程造价全过程管理 信息化建设 投资监控系统 工程造价数据库 Whole-process management of engineering cost Information-based construction Investment monitoring system Engi- neering cost database
  • 相关文献

参考文献4

二级参考文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部