摘要 石横特钢2~#450 m^3高炉在第二代炉役生产过程中,针对两个测温点温度升高、炉腰炉腹部位西侧炉皮频繁发红的情况,通过含钛物料入炉、提高铁水钛含量的方法进行护炉操作,及时采取冷却壁栽棒和炉体灌浆等设备维护措施,优化调整操作制度,加强安全生产,实现了高炉的安全稳定运行并取得了较好的技术经济指标。 In the second generation production process of No.2 450 m^3 blast furnace in Shiheng Special Steel, due to the temperature increasing of two measurement points, the parts of furnace waist abdomen bit and the west of the furnace hearth were heated redness frequently, the maintenance measures were taken. Such as the protection furnace operation was taken using the titanium-containing material charged into the furnace to improve the titanium content of molten iron, the planting sticks was take and furnace cooling wall grouting timely etc. The operating system was optimized and adjusted, the safety of production was improved, the safe and stable operation of the blast furnace and good technical and economic indicators were achieved.
出处 《山东冶金》 CAS 2016年第4期14-16,共3页 Shandong Metallurgy
关键词 高炉 护炉 操作制度 炉体灌浆 blast furnace furnace protection operating system furnace filling
  • 相关文献

参考文献2

二级参考文献33

  • 1清水文雄,藤原稔,盐田哲也,等.大分第2高炉(1次)炉体解体调查结果[J].CAMP,1989(2):980.
  • 2西泽庄藏,神保高生,柏田昌宏,等.住金和歌山第3高炉(3次)解体调查结果[J].铁钢,1993,79:T9.
  • 3池田顺一,水原正义,堀尾竹弘,等.君津3高炉炉底耐火物解体调查[J].铁钢,1984,70: 740.
  • 4研野雄二,析冈正毅,梅津善德,等.君津3高炉制铁技术进步[J].制铁研究,1984,320:237.
  • 5富田幸雄,田中腾博,舟越孝久,等.高炉死料堆填充结构对炉底内衬温度的影响[J].CAMP-ISIJ,1999(12):644.
  • 6渡壁史朗,武田斡治,泽义孝,等.用低透液层控制高炉炉缸铁水流动和炉底长寿[J].CAMP-ISIJ,1999(12):648.
  • 7M. E. Barbes-Femandez, E. Marinas-garcia, E. Brandaleze,et al. Design of Blast Furnace Crucibles by Means of the Nodal Wear Model[J]. ISIJ Inter. , 2008,48 (2), 134-140.
  • 8K. Takatani, T. Indda, K. Takata. Methematical Model for Transient Erosion Process of Blast Furnace Hearth [ J ], ISIJ In- ter., 2001,41 (10): 1139-1145.
  • 9J. Torrkulla, H. Saxen. Model of State of the Blast Furnace Hearth[J]. ISIJinter. , 2000,40 (5): 438-447.
  • 10T. Bakker, L. Bol, R. Molenaar, The 2006 Reline of Corus Ij- muiden Blst Furnace No. 7[J]. Iron and Steel Technology, 2008, (5) : 297-306.

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部