摘要
抽水蓄能电站工程建设阶段包括筹建期、工程准备期、主体工程施工期、工程完建期、竣工验收期几个阶段,本文对国内已建和在建的抽水蓄能电站实际工期进行了统计和分析,对抽水蓄能电站工程建设各阶段的合理工期提出了建议。
The pumped storage power station project construction stage can be divided into preparation, construction preparation, main works and project completion. Via statistical analysis on the actual construction time limit of the domestic pumped storage power station either in built or under-construction, this paper put forward some suggestions about the reasonable time limit for all project construction periods of pumped storage power station.
出处
《水电与抽水蓄能》
2016年第4期90-94,共5页
Hydropower and Pumped Storage
关键词
抽水蓄能电站
工程建设
合理工期
pumped storage power station
project construction
reasonable time limit