摘要
A new tuner control system for spoke superconducting radio frequency(SRF) cavities has been developed and applied to cryomodule I of the C-ADS injector I at the Institute of High Energy Physics, Chinese Academy of Sciences. We have successfully implemented the tuner controller based on Programmable Logic Controller(PLC)for the first time and achieved a cavity tuning phase error of ±0.7?(about ±4 Hz peak to peak) in the presence of electromechanical coupled resonance. This paper presents preliminary experimental results based on the PLC tuner controller under proton beam commissioning.
A new tuner control system for spoke superconducting radio frequency(SRF) cavities has been developed and applied to cryomodule I of the C-ADS injector I at the Institute of High Energy Physics, Chinese Academy of Sciences. We have successfully implemented the tuner controller based on Programmable Logic Controller(PLC)for the first time and achieved a cavity tuning phase error of ±0.7?(about ±4 Hz peak to peak) in the presence of electromechanical coupled resonance. This paper presents preliminary experimental results based on the PLC tuner controller under proton beam commissioning.
基金
Supported by Proton linac accelerator I of China Accelerator Driven sub-critical System(Y12C32W129)