摘要
通过对桐柏蓄能电站上水库主坝坝后坡渗水的分析,找出确切的渗水原因及渗水通道,并对渗水进行了有效处理,解决了坝后坡渗水缺陷,确保了大坝安全。
The cause and passage of seepage at back-slope of main dam of upper reservoir of Tongbaipumped storage power station were found after detailed analysis.The effect of treatment was proved tobe successful which ensured the safety of main dam.
出处
《大坝与安全》
2016年第3期73-76,共4页
Dam & Safety
关键词
主坝
坝后坡
渗水分析
处理
main dam
back-slope of main dam
seepage analysis
treatment