以水代汽工艺在延迟焦化装置上的应用 被引量:6

Application of water instead of steam in delayed coking unit
下载PDF
导出
摘要 介绍了中国石化洛阳分公司140万t/a延迟焦化装置焦炭塔大吹汽流程节能改造的情况。改造采取凝结水和蒸汽混合进入焦炭塔的以水代汽工艺,新增凝结水专用雾化器,采用先进可编程逻辑控制(PLC)系统,在蒸汽进入焦炭塔管线处增加凝结水管线。改造后的运行结果表明:装置操作稳定;与改造前相比,平均单次大吹汽过程蒸汽节约量为16.13 t,装置能耗降低了1.99 kg/t(以标准油计);产品焦炭中挥发分的质量分数小于16%,焦炭塔塔壁降温速率低于40℃/h。 The energy saving revampments of coke tower big steam out process were introduced in the1. 4 Mt / a delayed coking unit of Luoyang branch,SINOPEC. Reformation measures were taken as follows,adopting the technology of water instead of steam by the mixture of condensate and steam into the coke tower,adding condensate special atomizer,using advanced programming logic control( PLC)system and adding the condensate pipeline at the location of the steam into the coke tower pipeline. The revamped running results showed that the device operation was stable. Compared with before revampment,the steam savings of average single big steam out process were 16. 13 t,and the unit energy consumption reduced by 1. 99 kg / t( calculated as standard oil),the mass fraction of volatiles in coke products was less than 16%,the falling temperature rate of the coke tower wall was below 40 ℃ / h.
出处 《石化技术与应用》 CAS 2016年第5期403-405,427,共4页 Petrochemical Technology & Application
关键词 延迟焦化 焦炭塔 水蒸气 凝结水 焦炭 雾化器 挥发分 节能降耗 delayed coking coke tower steam condensate coke atomizer volatiles energy saving
  • 相关文献

参考文献22

二级参考文献44

共引文献53

同被引文献43

引证文献6

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部