矮塔斜拉桥混凝土箱梁施工阶段风荷载影响分析 被引量:1

Wind load effect on low-pylon cable-stayed bridge during construction of box girders
下载PDF
导出
摘要 南澳大桥主桥的混凝土箱梁施工中,当地风环境条件极其恶劣,在成桥最大悬臂状态时,对风荷载作用下的结构动力特性进行计算分析。在无类似相关经验和参数选取的条件下,通过施工前期观测统计,合理选取风荷载参数,采取安全可靠的方案措施,科学合理控制施工最大允许风速,有效避免了竖向涡激共振对浇筑混凝土质量的影响。 During the construction of concrete box girders for the main part of Nan'ao Bridge, the local wind conditions wereextremely bad. We analyzed the dynamic characteristics of the structure under the effect of wind loading when the bridge was inits maximum cantilevering position. As there were no similar experience and parameters available, parameters for wind loadswere rationally selected on the basis of the data of observation made in the early stage of the project. Safe and reliable measureswere taken and the highest allowable wind velocity was scientifically and rationally controlled to effectively avoid the effect ofthe vertical vortex induced resonance on the quality of concrete.
作者 李春元
出处 《中国港湾建设》 2016年第9期26-30,共5页 China Harbour Engineering
关键词 矮塔斜拉桥 混凝土箱梁 施工阶段 风荷载影响 low-pylon cable-stayed bridge concrete box girder construction stage effect of wind loading
  • 相关文献

参考文献6

  • 1中国公路工程咨询集团有限公司. 广东省南澳大桥工程(第三合同段)施工图及设计说明书[R]. 2008.
  • 2中交第一航务工程局有限公司. 广东省南澳大桥工程(第三合同段)总体施工组织设计[R].2009.
  • 3《Midas2012桥梁专用有限元分析软件》使用说明书[K]. 2012.
  • 4李文治,訾银辉.大跨度斜拉桥最大悬臂施工状态动力特性分析[J].山西建筑,2012,38(17):212-214. 被引量:2
  • 5JTG/TD60-01-2004.公路桥梁抗风设计规范[S].[S].,..
  • 6邱捷.桥梁典型断面三分力系数雷诺数效应数值研究[D].湖南:中南大学,2010.

二级参考文献3

共引文献154

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部