1Papalexoponios A D, Hesterberg T C. A regression-based approach to short-term system load forecasting[J]. IEEE Trans on Power Systems,1990, 5(4): 1535-1547.
2Moghram I, Rahman S. Analysis and evaluation of five short-term load forecastingtechniques[J]. IEEE Trans on Power Systems, 1989, 4(4):1484-1491.
3Daneshdoost M, Loffalian M, Bumroonggit G et al. Neural network with fuzzy set-based classification for short-term load forecasting[J]. IEEE TransonPowerSystems, 1998, 13(4): 1386-1391.
4Hippert H S, Pedreira C E, Souza R C. Neural networks for short-term load forecasting: a review and evaluation[J]. IEEE Trans on Power Systems, 2001, 16(1): 44-55.
5Rahman S, Bhatnagar R. An expert system based algorithm for short term load forecast[J]. IEEE Trans on Power Systems, 1988, 3(2):392-399.
6Hagan M T, Menhaj M. Training feed forward networks with the marquardt algorithm[J]. IEEE Trans on NN, 1994, 5(6): 989-993.
7The MathWorks. MATLAB User's Guide:High-performance Numeric Computation and Visualization Software[M].South Natick,M A,The Math Works Inc,1994.
8Oppenheim A V,Schafer R W. Digital Signal Processing[M].N Y:Prentice-Hall,1975.
9Proakis J G,Manolakis D G. Digital Signal Processing-Principles[A].N Y:Printice-Hall,1995.
10Cooley J W,Tukey J W. An algorithm for the machine computation of complex Fourier series[J].Mathematical Computations,1965.297-301.