期刊文献+

道砟胶应用于有砟-无砟轨道过渡段的关键控制技术 被引量:6

Key Control Technologies in Application of Ballast Glue to Ballast-Ballastless Track Transition Zone
下载PDF
导出
摘要 通过对有砟-无砟轨道过渡段存在问题的分析,指出过渡段最主要的病害为接合部地段薄弱和后期道床沉降差异大;采用道砟胶将散粒体道砟粘结起来可以解决这2个问题。针对目前国内采用道砟胶后存在的问题,总结了施工道砟胶的关键控制技术;提出应从设置位置、道砟质量、施工过程及材料质量、施工初期质量和施工后期质量5个方面来控制道砟胶的施工质量,并从根本上解决有砟-无砟轨道过渡段病害造成的频繁维修问题,达到后期养护维修工作量少的目的。 Through the analysis of the existing defects in ballast-ballastless track transition zone,the most important defects in transition zone are the weak joint zone and the large settlement difference of roadbed. These two problems can be solved by gluing ballast together by using ballast glue. In view of the existing problems after using ballast glue in China,the key control technologies of ballast glue during construction were summarized. The construction quality of using ballast glue should be controlled through five aspects,which are the location,the ballast quality,the construction process and material quality,the early construction quality,and the late construction quality. The frequent maintenance caused by the defects in ballast-ballastless track transition zone can be avoided fundamentally to achieve the purpose of maintenance reducing during later period.
作者 朱永见
出处 《铁道建筑》 北大核心 2016年第8期133-136,共4页 Railway Engineering
关键词 有砟-无砟轨道 过渡段 道砟胶 施工控制 Ballast-ballastless track Transition zone Ballast glue Construction control
  • 相关文献

参考文献5

  • 1中国铁路总公司.TJ/GW 116—2013聚氨酯道砟胶暂行技术条件[S].北京:中国铁道出版社,2014.
  • 2罗强,蔡英,李成辉.高速铁路路桥过渡段的动力分析与结构设计[J].路基工程,1998(1):1-5. 被引量:8
  • 3ESVELD C.现代铁路轨道[M].王平,陈嵘,井国庆,译.2版.北京:中国铁道出版社,2014.
  • 4LAKUI S,AHAC M,HALADIN I.Track Stability Using Ballast Bonding Method[J].Slovenski Kongres O Cestah In Prometu,2010(10):332-340.
  • 5许琰,李家林.沥青道床新型轨下基础[J].铁道建筑,1980(1):4-9.

共引文献7

同被引文献26

引证文献6

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部