丰满水电站施工期下游供水库水位控制 被引量:1

Reservoir water level control for guaranteeing downstream water supply of Fengman hydropower station in construction period
下载PDF
导出
摘要 丰满水电站全面治理(重建)工程施工期必须保证不间断地向下游供水,为保障下游供水安全,泄洪兼导流洞将作为非常时期保下游供水的备用通道。为满足施工期启用泄洪兼导流洞为下游供水,依据泄洪兼导流洞模型试验成果、供水和隧洞运行要求,并考虑水库冰冻期冰冻厚度影响,最终确定保下游供水水库控制水位,为施工期水库合理调度提供依据。 The Fengman reservoir must ensure the uninterrupted downstream water supply in the construction period of Fengman hydropower station rebuild project. The discharge and diversion tunnel is taken as the standby convey for downstream water supply in construction period.Considering the model test results of flood discharge and diversion tunnel, the water supply and the tunnel operation requirements, and the influence of frozen thickness in freezing period, the control reservoir water level is determined for guaranteeing downstream water supply,which could provide basis for reasonable dispatching of reservoir in construction period.
出处 《东北水利水电》 2016年第9期9-12,71,共4页 Water Resources & Hydropower of Northeast China
关键词 施工期 启用泄洪兼导流洞 保下游供水 库水位控制 construction period opening flood discharge and diversion tunnel guarantee downstream water supply reservoir water level control
  • 相关文献

参考文献5

  • 1中水东北勘测设计研究有限责任公司.丰满水电站全面治理(重建)工程施工期水库调度方案[R].长春:中水东北勘测设计研究有限责任公司,2010,12.
  • 2中水东北勘测设计研究有限责任公司.丰满水电站全面治理(重建)工程泄洪兼导流洞水工模型试验报告[R].长春:中水东北勘测设计研究有限责任公司,2013,11.
  • 3DL/T5195-2004水工隧洞设计规范[s].2002.
  • 4刘志明,温续余等冰工设计手册.第7卷泄水与过坝建筑物[M].北京:中国水利电力出版社,2014.
  • 5张从联,钟伟强,江洧.泄洪洞有压流问题试验研究与初探[J].华南理工大学学报(自然科学版),2003,31(z1):70-73. 被引量:5

二级参考文献3

  • 1[1]中南勘测设计院.电力工业标准汇编@水电卷(水工下册)[M].北京:水利电力出版社,1995.
  • 2高又生,徐恒谐.泄水道明满流试验研究[J].水利学报,1964,(4):52-57.
  • 3[3]华东水利学院.水工设计手册(第7册)[M].水电站建筑物.北京:水利电力出版社,1989.

共引文献4

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部