摘要 针对壁板坡隧道存在多种特殊岩土和不良地质,易引发坍塌、突水、软岩变形等多种地质灾害的实际,提出了一种分级式超前地质预报管理机制。综合采用地质调查法、地震反射法、地质雷达法、红外探测法和超前水平钻法的超前地质预报方法,具有地质与物探相结合、长短距离相结合、物性参数互补的特点,能够比较准确地预报地质条件,减少占用工作面时间,加快施工进度。通过工程实际说明该方法取得较好的预报结果,为该类工程问题提供了有效的技术手段。 In view of the fact that there are many kinds of special rocks and bad geologies in the Bibanpo tunnel,which can easily cause geological disasters like collapse, water inrush, soft rock deformation, this study proposes a hierarchical management mechanism of geological prediction. The comprehensive advanced geological prediction by combining geological analysis, tunnel seismic prediction, ground penetrating radar, infrared detection with advance boreholes has such characteristics as the integration of geology and physical detection, the combination of long and short distance, and the complementarity of physical parameters, which can forecast the geological conditions accurately, reduce the occupation time and speed up the construction progress. The engineering practices show that the method has achieved good results and provided effective technical means for the same engineering problems.
出处 《华东交通大学学报》 2016年第4期18-23,共6页 Journal of East China Jiaotong University
关键词 复杂地质 特长隧道 超前预报 分级管理 综合地质预报技术 complex geology long tunnel advanced forecast hierarchical management comprehensive geological prediction technique
  • 相关文献

参考文献10

二级参考文献136

共引文献432

同被引文献5

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部