以某工程为例,采用基坑管井降水设计方法设计得到了46口井的布置方案。以管井降水法求得的抽水量为初始参数,增加安全性约束条件,再利用目标函数法对降水井进行优化设计,优化后的设计方案减少了5口井。在满足设计需要的条件下,体现了目标函数法的优越性。
By means of project cases. 46 well of the well precipitation is obtained based on underground hydrodynamics. In pumping well point precipitation method of initial parameters obtained and increasing security constraints, using objective function method, the design of the dewatering well is optimized. 41 wells design project is obtained, thereby reducing 5 wells. In the condition of meeting the design needs, the objective function reflects its superiority.
出处
《中原工学院学报》
CAS
2016年第3期75-77,94,共4页
Journal of Zhongyuan University of Technology
关键词
井点降水
目标函数
约束条件
优化设计
优越性
the well precipitation
the objective function method
restrictions
design optimization
superiorit