摘要
从地基处理、钢筋工程、预埋套管及孔洞预留等方面,阐述了污水处理厂土建阶段施工要点,并提出了施工过程中的质量控制措施,从而确保污水处理厂的正常运行。
Starting from aspects of foundation treatment,steel engineering,pre-embedded tube and hole preserved,the paper describes construction points of sewage treatment plant at civil construction phase,and puts forward quality control measures in the construction process,so as to guarantee normal operation of the sewage treatment plant.
出处
《山西建筑》
2016年第26期126-127,共2页
Shanxi Architecture
关键词
污水处理厂
地基处理
钢筋工程
质量控制
sewage treatment plant
foundation treatment
steel engineering
quality control