竖井溢洪洞进口段水工模型试验研究

Experiment and Research of Hydraulicmodel at Inlet Section of Spillway of Shaft
下载PDF
导出
摘要 通过建立水工物理模型,合理的确定堰顶高程,在设计、校核水位下,有效的增加下泄流量2.2%和3.2%;调整环形掺气坎起坡点高程及坡度,水流流态稳定,水流掺气效果较好;增加挑流坎、掺气孔可有效的降低堰面负压值,使负压值满足规范设计要求。 By establishing the physical model for a hydraulic structure to conform reasonably the crest elevation,discharge was increased effectively by 2.2% and 3.2% under water design and check levels. The elevation and gradient of the initial sloping spot in circle air mixing bucket were adjusted to appear that the flow regime was stable, and the effect of water flow mixing was better. To increase the bucket and mixing air hole may reduce effectively the negative pressure value of weir surface for the negative value to meet the demands of specification design.
作者 梁迟
出处 《黑龙江水利科技》 2016年第4期163-165,共3页 Heilongjiang Hydraulic Science and Technology
关键词 水工模型 溢洪洞 掺气坎 挑流坎 流态稳定 hydraulicmodel spillway air mixing bucket trajectory bucket fluid stability
  • 相关文献

参考文献4

二级参考文献11

  • 1董兴林,高季章,鲁慎吾,钟永江.导流洞改为旋涡式竖井溢洪道综合研究[J].水力发电,1995,22(3):32-37. 被引量:32
  • 2董兴林,高季章,钟永江.超临界流旋涡竖井式溢洪道设计研究[J].水力发电,1996,23(1):44-48. 被引量:20
  • 3Wagner W E . Morning-glory shaft spillway Determination of pressure controlled profiles [J] . Proc . ASCE . 1954, 80: 2-9.
  • 4法尔维HT著.水工建筑物中的掺气水流[M].王显焕译.北京:水利电力出版社,1984.
  • 5王念慎,董兴林.攀枝花瓜子坪竖井排洪系统试验终结报告[R].北京:水利水电科学研究院,1987.
  • 6孙双科,姜涵,等.大石门水电站竖井式溢洪道水工模型试验研究[R].北京:中国水利水电科学研究院,2008.
  • 7陈肇和,韩立,等译.泄流建筑物水力计算手册[M].北京:北京水利水电规划设计总院,华北水电学院北京研究生部,1993.
  • 8Jain S C. Tangential Vortex-Inlet [ J ] . Journal of Hydraulic Engineering, 1984, 110 (12) : 1693-1699.
  • 9董兴林,杨开林,等.广东清远抽水蓄能电站下水库竖井泄洪洞试验研究报告[R].北京:中国水利水电科学研究院水力学所,2009.
  • 10董兴林,郭军,杨开林,等.导流洞改建竖井式泄洪洞优化体型试验与设计理论研究-旋流竖井泄洪洞方案[R].北京:中国水利水电科学研究院水力学所,2005.

共引文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部