摘要
为实现矿井水复用“零排放”工程,对万利一矿地下矿井水循环系统进行了规划设计,然而,在按照原规划实施过程中,存在安全隐患且无法满足矿井水处理及复用要求,因此,必须对原工程规划进行新的改进设计。按新规划将42301采空区、42113采空区和42103~42108采空区连为整体储水区施工后,通过注水试验及水质检验证实了其优越性。
In order to realize the mine water reuse and "zero release" project, Wanli No. 1 Coal Mine made the planning and design of its underground mine water circulation system. However, according to the original plan, there were safety risks and it could not meet the requirements of mine wastewater treatment and reuse in implementation process. Therefore, the original project planning needs to revise. 42301 goal, 42113 goaf and 42103 -42108 goal were as a whole storage area in the new plan construction. Superiorities of the new plan were proved by water injection tests and water quality inspection.
出处
《煤矿安全》
CAS
北大核心
2016年第9期148-150,154,共4页
Safety in Coal Mines
基金
国家自然科学基金资助项目(51234005
51504259)
中央高校基本科研业务费专项资金资助项目(2010QZ06)
国家大学生创新训练资助项目(C201501042)
关键词
矿井水
采空区
地下水库
复用
零排放
mine water
goal
underground reservoir
reuse
zero release