摘要
针对同煤集团四台矿现有原煤皮带运输的供电设计已经无法满足生产需求,需要对其进行供电改造。本文分析计算了在输电线路改造过程中所需电缆的长度和开关型号,及皮带增容提速所需的额定功率,保证了开关容量达到要求。
In view of the power supply design of the existing raw coal belt transport that has been unable to meet the production requirements used in Sitai Mine of Datong Coal Mine Group, power supply reform is needed to carry on. The required cable length, switch model in the process of transmission line reform and rated power that compatibilizing to speed up of belt needs are analyzed and calculated, and the switch capacity is ensured to meet the requirements.
出处
《同煤科技》
2016年第4期41-43,共3页
Datong Coal Science & Technology
关键词
皮带运输
输电线路
增容提速
供电改造
额定功率
Belt transport
Transmission line
Compatibilizing to speed up
Power supply reform
Rated power