某万t级超深金矿扩建工程开采方案论证 被引量:1

Exploitation Scheme Optimization of a 10000t/dover Deep Gold Mine Project
下载PDF
导出
摘要 针对某万t级超深金矿扩建工程,提出了3种开采方案,从资源分布、合理服务年限、提升运输及充填排水设备可靠性、建设周期、建井技术及施工装备水平、投资、成本效益等方面对方案进行了比较分析,同时充分考虑深井开采的高温、岩爆预防所带来的施工难度等影响因素,通过综合分析比较,提出了科学合理的开采方案。 For deep exploitation scheme of 10000t/d expansion project, the paper proposed three kinds of mining plans by comparing and analyzing the distribution of resources, reasonable service life, hoist and transport and filling and drainage equipment, construction cycle, construction technology and construction equipment level, investment, cost efficiency, and fully considered the construction difficultieswhich caused by the high temperature mining, rock burst prevention. Through comprehensivecompare, the scientific and reasonable exploitation scheme was proposed.
作者 朱利平
出处 《铜业工程》 CAS 2016年第4期45-49,共5页 Copper Engineering
关键词 扩建工程 开采方案 深井开采 开采成本 综合分析评估 extension project mining plan deep mining cost of mining comprehensive analysis andevaluation
  • 相关文献

参考文献7

二级参考文献7

共引文献11

同被引文献10

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部