针对下穿通道雨水泵站“扩容改造难”的设计思路

Design for Overcoming Difficulties in Expansion and Renovation of Storm Water Pumping Station for Underpass
原文传递
导出
摘要 在宁波市十七处下穿通道雨水泵站升级改造工程设计中,发现下穿通道雨水泵站均存在不同程度"扩容改造难"的问题。在分析原因后,建议在新建下穿通道雨水泵站时,采用工程项目生命周期理论,对雨水泵站系统不同的组成部分采用差异化标准,同时设计时融入"便于养护和升级改造"的理念。 All the storm water pumping stations were difficult in expansion and renovation in var- ying degrees in the design of upgrading 17 storm water pumping stations for underpasses in Ningbo. The causes were analyzed, and several suggestions were proposed. When designing a new storm water pum- ping station for underpass, it is recommend that the life-cycle theory will be adopted, differential stand- ards will be used in different components for the storm water pumping station system, and the concept of "easy maintenance and easy upgrading" will be integrated
出处 《中国给水排水》 CAS CSCD 北大核心 2016年第18期64-67,共4页 China Water & Wastewater
关键词 下穿通道雨水泵站 扩容改造 差异化标准 便于养护和升级改造 storm water pumping station for underpass expansion and renovation differential standard easy maintenance and easy upgrading
  • 相关文献

参考文献1

  • 1GB50014-2006,室外排水设计规范(2014年版)[S].北京:中国计划出版社,2014.

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部