期刊文献+

露天矿垂向反向运输对运输成本的影响 被引量:3

Influence of the vertical-reverse transportation on the transportation cost of open-pit mines
下载PDF
导出
摘要 提出露天矿运输设备在运输过程中存在先下后上问题,并将此定义为垂向反向运输问题.指出实际生产中,露天矿往往只考虑运输设备克服装载点与卸载点之间的高程差带来的成本,并未考虑因垂向反向运输增加的运输成本.垂向反向运输时运输成本相对增加,主要由动力消耗增大、上下坡时速度损失和机械设备磨损增加造成的.以黑岱沟露天煤矿为例,通过对露天矿垂向反向运输中运输成本的增加值进行量化计算,为露天矿提供较为精确的运输成本计算模型,从而为露天矿开拓运输系统的设计和现场管理提供依据. The issue of first downhill and then uphill for open-pit mine transport equipment in the transport processis is raised as a problem of vertical reverse transportation( VRT). It is well known that,in actual production,only the cost of overcoming vertical difference between the starting and ending points has been already considered while the transport cost of the VRT is ignored. When the VRT occurs,the other three parts should be added into the transport costs,including the increased power consumption,the speed loss during the downhill and uphill of the transport equipment,and the increased machinery wear and tear. By taking Heidaigou open-pit coal mine as an example,this paper quantifies the additional value of open-pit transport costs when the VRT occurs,and provides a more accurate model for the open-pit transport costs,so as to provide the basis for the design and management of the pit haulage system.
出处 《深圳大学学报(理工版)》 EI CAS CSCD 北大核心 2016年第5期464-469,共6页 Journal of Shenzhen University(Science and Engineering)
基金 国家高技术研究发展计划资助项目(2012AA062004)~~
关键词 采矿工程 露天矿 高程提升 垂向反向运输 物料调度和流优化 运输成本量化 开拓运输系统 mining engineering open-pit mine vertical upgrade vertical-reverse transportation material flow scheduling and optimizating transportation cost quantification open haulage system
  • 相关文献

参考文献4

二级参考文献36

  • 1中国矿业学院.露天采矿手册[M].北京:煤炭工业出版社,1986.
  • 2[1]周昌寿,杜竞中,郭增涛,等.露天煤矿边坡稳定[M].徐州:中国矿业大学出版社,1990.
  • 3杨荣新.露天采矿学[M].徐州:中国矿业大学出版社,1990.
  • 4杨荣新.露天开采的方案优化[J].煤矿设计,1986,(2).
  • 5Alarie S, Gamache M, 2002. Overview of solution strategies used in truck dispatching systems for open pit mines. In- ternational Journal of Mining, Reclamation and Envi- ronment, 16(1): 59- 76.
  • 6Alford C, 1995. Optimisation in underground mine design. //Proc. of XXV APCOM Symp (McKee Ded.). Mel- bourne: Inst. of Mining and Metallurgy. 213 -218.
  • 7Chanda E K, Ricciardone J, 2002. Long term production sched- uling optimization for a surface mining operation: an ap- plication of MINEMAX scheduling software. Interna- tional Journal of Surf&ce Mining, Reclamation and Envi- ronment, 16: 144-158.
  • 8Dodin B, Elimam A A, 2008. Integration of equipment planning and project scheduling. European Journal of Operational Research, 184: 962-980.
  • 9Ercelebi N, Bascetin A, 2009. Optimization of shovel-truck system for surface mining. South African Institute of Min- in~ and Metallurgy Journal, 109: 433-439.
  • 10Ernst A T, Jiang H, Krishnamoorthy M, Sier D, 2004. Staff scheduling and Rostering: A review of applications, methods, and models. European Journal of Operational Research, 153: 3-27.

共引文献41

同被引文献18

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部