介绍了新疆天山电力奇台热电联产一期(2×350 MW)工程除渣水循环回用系统设计情况,并对设计、施工中出现的问题进行小结,供电力设计人员在今后设计中参考。
The paper introduced the design situation of deslagging water recycling system at the First Phase of Qitai Cogeneration Project (2×350 MW) in Xinjiang Tianshan Electric Power Co., Ltd., and summarized the problems in the design and construction pro-cess so as to provide reference for electric power design personnels in future.