大采高综采面顶板失稳控制研究 被引量:1

Research on Roof Instability Control in Fully Mechanized Face with Large Mining Height
下载PDF
导出
摘要 结合斜沟矿18110作业面工程实际,对大采高综采面末采期顶板管理展开探究,在分析18110作业面矿压显现规律的基础上,通过煤体预注固安特加固、挂网工艺优化等措施,有效解决了18110综采面末采时顶板管理难度大、安全事故多发的难题,为生产作业安全提供了有力保障。 Combined with engineering practice of 18110 work face in Xiegou Coal Mine, this paper studied roof management at the mining end in fully mechanized face with large mining height, analyzed mine pressure behavior of 18110 workface. Problems such as difficult roof management and multiple safety accidents were effectively solved by measures of reinforceing coal-body by pregrouting Guante and hanging net technology optimization, which provided a powerful guarantee for production safety.
作者 卫立刚
出处 《能源与节能》 2016年第10期180-181,共2页 Energy and Energy Conservation
关键词 大采高 综采 顶板失稳 矿压显现 控制措施 large mining height fully mechanized mining roof instability strata pressure behavior control measures
  • 相关文献

参考文献3

二级参考文献29

共引文献39

同被引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部