摘要
核电厂备件计划管理是备件管理工作的核心。为保证核电机组安全稳定运行,以最经济的方式,可靠及时地提供备件,是核电厂备件计划管理工作的根本目的。文章在学习总结和工作实践的基础上,就如何提高核电厂备件计划管理水平,在备件科学合理分类、库存定额优化、战略备件联合储备以及管理指标体系的建立等方面做了一些思考。
The plan management is the core of spare parts management. The ultimate intention of this work is to provide spate parts reliable and timely in the most economical way to ensure the stable and safety operation of nuclear power planks. This article takes some considerations about classification, inventory ration, combination storage and management index system on the basis of study and work practice to help to improve the spare parts plan management in nuclear power planks.
出处
《中国核电》
2016年第3期241-246,共6页
China Nuclear Power
关键词
核电厂
备件
计划管理
nudear power plant
spare parks
plan management