跨府河伏龙桥工程的行洪论证分析 被引量:2

Flood-discharge Capability Analysis of Fulong Bridge Across Fuhe River
下载PDF
导出
摘要 针对新建跨府河伏龙桥桥墩尺寸较大,影响河道行洪的问题,通过优化改造伏龙桥工程河段河道断面形式,来减小建桥引起的不利影响。同时采用二维数学模型模拟分析了断面优化前后的行洪过流情况。结果表明,断面改造后,工程河段桥位区附近流场有所调整,桥墩两侧局部流速有所增加,但总体满足抗冲要求,对河道行洪影响较小,拟建桥梁工程总体可满足200年一遇洪水防洪要求。研究结果可为伏龙桥工程建设提供理论依据,也可为类似工程提供参考。 In order to solve the problem of river flood which is induced by the big pier of new Fulong Bridge across the River Fu,this article reduced the adverse impact by optimizing the local section.And then two-dimensional mathematical model was adopted to simulate and analyze the flood discharge situation of the planning river course before and after building the bridge.The results show that the flow field near the bridge in the engineering reach is adjusted.After building the bridge,the local velocity of flow near the pier will increase,but it reaches the requirements of erosion in generally.In totally,the project satisfies the flood control requirements of two-hundred-year return period flood.The research results can provide theoretical basis for Fulong bridge construction as well as a reference for similar projects.
出处 《水电能源科学》 北大核心 2016年第9期67-70,共4页 Water Resources and Power
基金 国家自然科学基金项目(51409224 50949057) 国家科技支撑计划项目(2012BAB05B02)
关键词 跨河桥梁 断面优化 行洪能力 局部冲刷 bridge across river section optimization flood discharge capability local scour
  • 相关文献

参考文献1

  • 1GB50286-2013,堤防工程设计规范[S].北京:中国计划出版社,2013.

同被引文献12

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部