摘要
鉴于连接线的热故障是发电厂设备运行中的常见故障,若不及时排除,会对整个系统的安全可靠运行带来严重影响,结合铜街子水电站220 k V连接线热故障情况,采用逐项排除法进行分析,提出了有效的解决方案及预防措施。
Thermal failure of the connecting line is a common fault of the power plant devices, which could seriously in- fluence the safe and reliable operation of the whole system. A thermal failure of the 220 kV connecting line in Tongjiezi Hydropower Station is introduced. With a one-by-one elimination method, the fault is successfully resolved. Prevention measures are also proposed.
出处
《水电与新能源》
2016年第9期70-71,共2页
Hydropower and New Energy
关键词
220
KV
连接线
热故障
处理措施
220 kV
connecting line
thermal failure
treatment measures