基于BIM的施工资源配置仿真模型自动生成及应用 被引量:16

Simulation Model Generation and Application Based on BIM for Resource Allocation
下载PDF
导出
摘要 针对目前工程施工资源配置面临的建模过程复杂、效率低等问题,本研究提出一种基于BIM模型数据标准IFC的资源配置离散事件仿真模型自动生成算法。本研究首先构建了基于IFC的进度资源信息模型,通过分析IFC模型与离散事件仿真模型的异同,实现前者向后者的自动转换。并将上述模型与模拟退火算法相结合,开发了模型转换及资源配置离散事件仿真分析软件,应用于实际工程,验证模型自动构建方法的可行性及正确性。结果表明,研究成果可提高仿真建模的速度与准确率,为管理人员快速准确的进度与资源配置、管控提供有力工具。 To eliminate low effort and complicated model process needed in data modeling for resource allocation,a BIM-based approach to automatically generate discrete event simulation( DES) model for resource allocation was proposed. Firstly,a model was established based on IFC to model schedule and resource information. Then,with comparison of IFC model and DES model,automatic conversion from the former to the latter was achieved. Finally,taking simulated annealing as the optimization module,a model generation and optimization application was developed for resource allocation,and was validated in a real project. Results show that automatic generation of DES model can reduce mistakes and avoid rework in resource allocation modeling, thus facilitating decision making in schedule and resource trade off.
作者 林佳瑞 张建平 Lin Jiarui Zhang Jianping(Department of Civil Engineering, Tsinghua University, Beijing 100084, China)
出处 《施工技术》 CAS 北大核心 2016年第18期1-6,共6页 Construction Technology
基金 国家"863"计划项目(2013AA041307) 国家自然科学基金项目(51278274)
关键词 信息化 建筑信息模型 IFC 离散事件 仿真 资源配置 information building information modeling(BIM) industry foundation classes discrete event simulation resource allocation
  • 相关文献

参考文献10

  • 1I,IU Y, ZHAO S, DU X, et al. Optimization of resource allocation in construction using genetic algorithms [ C ]// 2005 International conference on machine learning and cybernetics. IEEE, 2005: 3428-3432.
  • 2CHAHARSOOGHI S K, KERMANI A H M. An effective ant colony optimization algorithm (ACO) for muhi-objective resource allocation problem (MORAP) [ J ]. Applied mathematics and computation, 2008,200( 1 ) : 167-177.
  • 3ELRAYES K, JUN D. Optimizing resource leveling in construction projects [ J ]. Journal of construction engineering and management, 2009,135 ( I 1 ) :I 172-1180.
  • 4HEON JUN D, ELRAYES K. Muhiobjeetive optimization of resource leveling and allocation during construction scheduling [ J ]. Journal of construction engineering and management, 2011 ,137(12) :1080-1088.
  • 5LIANG Y, CHUANG C. Variable neighborhood search for muhi- objective resource allocation problems [ J ]. Robotics and computer-integrated manufacturing, 2013,29 ( 3 ) :73-78.
  • 6林佳瑞,张建平,钟耀锋.基于4D-BIM的施工进度-资源均衡模型自动构建与应用[J].土木建筑工程信息技术,2014,6(6):44-49. 被引量:26
  • 7LIEBICH T. Unveiling IFC2x4-the next generation of open BIM [ C ]// 27th international conference - applications of IT in the AEC industry & accelerating BIM research workshop ( CIB W78 2010).
  • 8Cairo, Egypt, 2010. FAN K, YOU W, LI Y. An effective modified binary particle swarm optimization (mBPSO) algorithm for multi-objective allocation problem ( MORAP ) [ J ]. Applied mathematics and computation, 2013,221:257-267.
  • 9ABDELSALAM H M, RASMY M H, MOI:IAMED H G. A Simulation-based time reduction approach for resource constrained design structure matrix[ J]. International journal of modeling and optimization, 2014,4( 1 ).
  • 10MENDES J J M, GONCALVES J F, RESENDE M G C. A random key based genetic algorithm for the resource constrained project scheduling problem [ J ]. Computers & operations research, 2009,36( 1 ) :92-109.

共引文献25

同被引文献161

引证文献16

二级引证文献219

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部