期刊文献+

龙化路旧路面施工方法研究

Research on Construction Method for Old Road Surface of Longhua Road
下载PDF
导出
摘要 2015年,在龙化路施工过程中,存在原有旧水泥路面现状较差的现象,通过对原有状况的调查,确定采取对裂缝、断板、脱空等处理,以使基层达到稳定。在两种不同的混凝土层间喷洒乳化沥青,并铺设玻璃纤维聚酯布,使层间更好粘结,体现整体性;同时,加铺沥青砼结构,使道路的承载能力得到提高和加强,从而体现出复式路面的经济、耐用及舒适性。 In 2015, the old cement concrete road was poor conditions when the Longhua road was constructing. By inspecting the condition of existing problems, we can confirm that how to deal with crevice, broken pavement, disengaging etc, and how to stabilize the basement. Between the two kinds of different concrete layer, we can splash emulsified as-phalt which combine with fiberglass cloth, to make sure the layers is stuck firmly and inte-grally. Paving the asphalt concrete is trying to improve in load capacity of the road, which reflects the multiple roads which is economical,durable and comfortable.
作者 安海龙
出处 《油气田地面工程》 2016年第9期84-85,88,共3页 Oil-Gas Field Surface Engineering
关键词 水泥路面 玻璃纤维聚酯布 沥青砼 摊铺 平整度检测 cement concrete fiberglass cloth asphalt concrete paving IRI monitoring
  • 相关文献

参考文献1

  • 1张闽,果有刚,景飒,等.城镇道路工程施工与质量验收规范:CJJ1--2008[S].北京:中国建筑工业出版社,2008:81-84.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部