“华龙一号”核电工程混凝土管理模式研究 被引量:2

Research on Concrete Management Patterns of HPR1000 NPP
下载PDF
导出
摘要 介绍了国内核电工程混凝土管理模式现状,分析了华龙一号核电工程混凝土实行甲供与乙供管理模式的优缺点,结合华龙一号核电工程混凝土需求量大的自身特点,文章重点从经济性方面对甲、乙两种供应模式进行对比研究,从降低工程造价和项目管理角度综合分析得出甲供模式为核电项目混凝土管理最优模式,以期对后续同机型核电工程混凝土管理模式提供参考和借鉴。 This paper introduces the current situation of concrete management pattern in domestic nuclear power project and analyzes the advantages and disadvantages of concrete supply management patterns bewteen plan A and plan B for HPR1000 nuclear power project. Considering the great demand of concrete for HPR1000 nuclear power project, the paper mainly makes contrastive study to the A and B Supply pattern from the economic aspect. By making comprehensive analysis, it is concluded that A Supply is the optimal pattern from the perspective of reducing cost and project management. It is hoped that the research can provide reference for concrete management pattern of the following nuclear power project with the same type of unit.
作者 黄政宇
出处 《南方能源建设》 2016年第3期116-121,共6页 Southern Energy Construction
关键词 华龙一号 核电工程 混凝土 管理模式s HPR1000 nuclear power project concrete management pattern
  • 相关文献

参考文献5

二级参考文献5

  • 1王华生.混凝土操作技术指南[M].北京:中国计划出版社,2000.
  • 2混凝土泵车操作说明书[M].五十铃汽车公司出版,2006.
  • 3HZS-60搅拌站说明书[M].山东鸿达集圃出版,2006.
  • 4火电施工质量检验及评定标准(土建篇)[S].
  • 5尹国元.混凝土基本技术[M].北京:金盾出版社,1995.

共引文献7

同被引文献9

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部