摘要
随着我国工程项目管理水平的不断提高,工程总承包模式在工程运用中逐步深入。尤其是石油、化工等行业运用较早,但对于核电工程总承包模式在我国起步较晚,特别是核电工程因"核"与其他工程项目有着特殊的一面,那就是需要更高的质量来确保核安全。作为核电业主方如何做好总承包模式下的工程质量监督管理值得深思。本文从5个方面阐述了如何构建核电工程总承包模式下业主工程质量监督管理机制,以达到从机制上来保证核电工程的质量。
As the project management level of our country continues to improve, the engineering contracting mode in engineering application is gradually deepening. Especially in the petroleum, chemical and other industries use earlier, but for nuclear power engineering general contracting mode in China started late, especially in nuclear power engineering because of " nuclear" and other projects has a special side, that is, the need to more high quality to ensure nuclear safety. As the owners of nuclear power party how to do the general contracting mode of engineering quality supervision management ponder. This article from 5 aspects elaborated how to build the nuclear power project general contracting mode of the owner of the project quality supervision and management mechanism, in order to achieve from the mechanism to ensure the quality of nuclear power projects.
出处
《南方能源建设》
2016年第3期122-126,共5页
Southern Energy Construction
关键词
核电
总承包
工程质量管理
nuclear power
general contract
project quality management