青岛市地铁2号线一期工程辽阳东路车辆基地超限高层结构设计 被引量:4

Out-of-code high-rise structural design of East Liaoyang Road vehicle base of the first phase project of Qingdao Metro Line 2
原文传递
导出
摘要 青岛市地铁2号线一期工程辽阳东路车辆基地为巨型柱框支剪力墙超限高层建筑,外包尺寸南北方向约为795m,东西方向约为317m,设有两道伸缩缝,形成具有A,B,C三区上托21个住宅塔楼的复杂转换结构,存在4项不规则。根据本项目结构体系特点,通过采取合理的抗震性能化设计目标和方法、加强关键构件的设计等措施,保证了结构设计的可靠性;采取设卡棱贝格道床垫、采用分仓法施工等可靠措施解决了盖下车辆振动噪声对盖上物业的影响及结构超长问题。 East Liaoyang Road vehicle base of the first phase project of Qingdao Metro Line 2 adopts mega-column frame supported shear wall out-of-code high-rise structure which has overall dimension size about 795m in the north-south direction and about 317m in east-west direction. There are two expansion joints to form a complex transformations structure to support upper 21 residential buildings in three districts of A, B and C. The project includes a total of four irregularities. According to the structural system features of the project, measures were adopted including the reasonable performance-based seismic design goals and methods and strengthening critical component design, to ensure the reliability of the structural design. This project adopts reliable measures as Calenberg road mattress and separate warehouse method construction to solve the problem of vehicle vibration noise effect on the over-track property development and the problem of super-long structure.
出处 《建筑结构》 CSCD 北大核心 2016年第18期23-27,共5页 Building Structure
关键词 青岛地铁2号线一期工程 车辆基地 振动噪声 超长结构 巨型柱框支剪力墙结构 first phase project of Qingdao Metro Line 2 vehicle base vibration noise super-long structure mega-column frame supported shear wall structure
  • 相关文献

参考文献3

  • 1建筑抗震设计规范GB50011-2010[S].北京:中国建筑工业出版社,2010.
  • 2高层建筑混凝土结构技术规程.JGJ3-2010[S].北京:中国建筑工业出版社,2011,6,1.
  • 3超限高层建筑工程抗震设防专项审查技术要点:建质[2015]67号[S].北京:中华人民共和国住房和城乡建设部,2015.

共引文献53

同被引文献7

引证文献4

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部