摘要 由于潇河源涡大坝以上流域下垫面发生较大变化,观测期间内产汇流状况改变明显,年径流量和年最大洪峰递减下降趋势显著,同时上游松塔水电站下闸蓄水也对源涡大坝处的设计洪峰值产生较大影响。鉴于设计洪峰值计算对于合理确定工程的规模及投资有至关重要的作用,为此,按照水文资料观测期间内一致性原则重新估算修正潇河源涡大坝处的设计洪峰值,为合理确定工程规模及投资提供技术支撑。 Due to the urbanization and the intensive change of the ground cover in upstream Xiao River area at Yuanwo dam, there were significant corresponding changes in the volume of runoff during observation periods. In particular, there were dramatic reductions in both annual volume of runoff and the maximum of flood peak. At the same time, the pre-designed calculations of the maximum of flood peak were significantly affected by the changed water retain level from the upstream Songta hydropower station. The design and measurements of flood peak are essential to the estimation of both dimension of constructions and investment scale. As a result, the design and calculation of flood peak at Yuanwo dam should be revised to be consistent with the actual data collected during the observation periods. The ideas and methods employed for the re-estimation can be used for reference to the similar constructions.
作者 王向明
出处 《中国防汛抗旱》 2016年第4期43-46,共4页 China Flood & Drought Management
关键词 潇河 源涡大坝 设计洪峰值 估算 Xiao River Yuanwo Dam estimation of maximum flood peak calculations
  • 相关文献

参考文献9

二级参考文献8

共引文献6

同被引文献10

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部