摘要
长河坝水电站地处川西高原,工程建设具有"六高一深"的特点,大坝工程建设管理难度大,工程地质条件复杂、地质灾害频发,外部建设环境复杂等建设难点问题。四川大唐国际甘孜水电开发有限公司坚持技术先行、创新管理、强化过程管控、积极开展设计优化,实现了工程质量、安全、进度、投资可控在控,在建设过程中全面贯彻中国大唐集团"价值思维、效益导向"核心理念,努力把长河坝打造成"工期短、造价低、质量优、效益好"的精品工程。
Changheba Hydropower Station is located in western Sichuan plateau. The construction of Station has features of “Six Highs and One Deep” because difficult dam construction management, complicated engineering geological conditions, frequent geological disasters and complex external environment. Through implementing a series of measures of adhering to technology orientation, innovating management, strengthening process control and optimizing design, the Owner achieves the quality, safety, process and investment of station project in control or controllable. In the construction of Station, the core philosophy of “Value Thinking, Efficiency-oriented” of China Datang Corporation is fully implemented for constructing a high-quality Changheba Hydropower Station project with short duration, low cost, excellent quality and good benefit.
出处
《水力发电》
北大核心
2016年第10期1-4,共4页
Water Power
关键词
管理
工程建设
长河坝水电站
management
project construction
Changheba Hydropower Station