期刊文献+

深水J型铺管系统塔架动态分析试验研究

J Type Deepwater Pipe Laying Test of Tower Dynamic System
下载PDF
导出
摘要 J型铺设是适用于深水管道铺设的重要方法。塔架作为J型铺设系统的关键部位,其结构性能尤为重要。本文通过建立塔架的三维力学分析模型,研究在复杂海况下J型铺设系统塔架的动态响应。通过搭建深水J型铺管系统模型试验台,对J型铺设系统进行模型实验研究,研究塔架的应力分布情况,对比数值模拟的结果。研究结果表明,波向角在0°-90°变化时,波向角越大,塔架的应力、应变越大,最大应力出现在底部桁架过渡位置。 J type laying is an important method for deepwater pipeline laying. As the key parts of J type tower laying system, its structural performance is particularly important. The tower is set up three-dimensional mechanical analysis model research in complex sea conditions J type dynamic response of tower laying system. By building a deepwater J-type pipelaying system model test bench, the J type laying system experiments were carried out to study the model, the tower is studied the stress distribution, comparison of the numerical simulation results. The results show that the wave angle at 0 degree to 90 degree change, wave direction angle is bigger, tower should stress and strain is bigger, the maximum stress appears at the bottom of the truss transition location.
作者 王鹭
出处 《现代制造技术与装备》 2016年第9期24-25,28,共3页 Modern Manufacturing Technology and Equipment
关键词 J型铺设 塔架 模态分析 瞬态分析 J type laying tower tower modal analysis transient analysis
  • 相关文献

参考文献4

二级参考文献57

  • 1William L Leffler, Richard Pattarozzi, Gordon Sterling. Deepwater Petroleum Exploration & Production[R]. USA, PennWell Corporation, 2003.
  • 2Yong Bai, Qiang Bai. Subsea Pipelines and Risers[R]. Great Britain, Elsevier Ltd, 2005.
  • 3Ben C Gerwick Jr. Construction of Marine and Offshore Structures[M]. USA, CRC Press, 2007.
  • 4sChristopher West, Stephen Armstrong, Damon MeMillan, et al. S-lay installation of riser fairings for the independence hub[C]//Proceedings of the International Conference on Offshore Mech~ics and Arctic Engineering. 2007(1):515-525.
  • 5Heedo D Yun, Ralf R Peek, Paul R Paslay, et al. Loading history effects for deep-water S-lay of pipelines[J]. Journal of Offshotve Mechanics and Arctic Engineering, 2004, 126(2): 156-163.
  • 6Massimo Pulici, Marian Trifon, Andrei Dumitrescu. Deep water salines installation by using the J-lay method-The blue stream experience[ C] //Proceedings of the International Offshore and Polar Engineering Conference, ISOPE. 2003:585-590.
  • 7Dick Wolbers, Rob Hovinga. Installation of deepwater pipelines with sled assemblies using the new J-lay system of the DCV balder[J]. Journal of Offshore Technology, 2003, 11 (3) : 46-57.
  • 8T A Netto, A Botto, M I Lourenco, et all. On the feasibility of installing SCR's by the reel-lay method[ C ]//' Proceedings of the 12th In- ternational Congress of the International Maritime Association of the Mediterranean. 2005(2):1447-1454.
  • 9Alastair Tawns. Reel-laying of rigid pipelines[J]. Materials Performance, 2004, 43( 10): 24-26.
  • 10llson P Pasqualino, Segen F Estefen, Silvia L Suva. The effect of the reeling laying method on the collapse pressure of steel pipes for deepwater[C]//Proceedings of the International Conference on Offshore Mechanics and Arctic Engineering, ASME. 2004(3):247- 254.

共引文献84

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部