摘要 铁路工程建设完工后,对概算进行清理是一项政策性强、涉及面广的工作,也是有效控制和确定工程投资的一个重要环节,可为建设项目的销号提供依据。那么在清理概算工作中,如何对自购料进行价差调整,此文在阐述自购料调差依据及必要性的基础上,对调差的计算方法及相关问题进行探讨,并以工程实例进行验证。 After the completion of the railway construction, clean - up of the estimates is a strong policy work involving a wide range. It is an important part of the investment project concerning about effectively control and determination, which can provide the basis for the clean - up of construction projects. This paper claimed the necessariarty of the clean -up budget due to the purchased materials and differences adjustment. We discussed the methods of differences adjustment and related problems, and verificated by some project examples.
作者 吴月峰
出处 《铁路工程技术与经济》 2016年第5期39-42,共4页 Railway Engineering Technology and Economy
关键词 铁路工程 概算清理 自购料调差 探讨 Railway project Cleanup of budget project Difference adjustment of purchased materials Discussion
  • 相关文献

参考文献4

二级参考文献10

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部